Overhaul-Rebuild and Fiber Addition

Overhaul-Rebuild and Fiber Addition

SCOPE ASEC is supporting our client with this 26-mile project that consists of 17 miles of overhaul-rebuild and an additional 9 miles of OPGW Fiber addition to the existing transmission line structures. The existing H-frame line is being converted to delta-monopoles....

read more
138kV Substation A-frame Analysis

138kV Substation A-frame Analysis

SCOPE ASEC’s client is rebuilding their existing 138kV transmission line and requested ASEC to analyze the existing substation dead-end structure to determine the maximum allowable pull-off tension capacity. PROJECT DESCRIPTION The terminal deadend structure was...

read more
138kV Substation Relocation

138kV Substation Relocation

SCOPE Re-route of 2 overhead 138kV transmission lines and 7 overhead 69kV transmission lines through the multi-phase construction of the new 138kV substation. PROJECT DESCRIPTION The construction of the overall substation was carried out in 20 smaller phases through...