Substation C/S Design

Substation C/S Design 138kV Substation A-frame Analysis SCOPE ASEC’s client is rebuilding their existing 138kV transmission line and requested ASEC to analyze the existing substation dead-end structure to determine the maximum allowable pull-off tension capacity....

Project Management

Project Management 500kV Structural Transmission Evaluation Program (STEP) Program SCOPE The purpose of the Structural Transmission Evaluation Program (STEP) is to give our client’s Transmission Asset Management a uniform and global view of the health of their 500kV...

Distribution

Distribution Fire Risk Mitigation (FiRM) program SCOPE As part of a client’s Electric System Hardening initiative ASEC has designed over 300 structures for increased reliability. All of these poles had Copper wire that was being replaced by new Aluminum wire. Some of...

Transmission

Transmission Overhaul-Rebuild & Fiber Addition SCOPE ASEC supported a 26-mile project that consisted of 17 miles of overhaul-rebuild and an additional 9 miles of OPGW Fiber addition to the existing transmission line structures. The existing H-frame line was...

Structural

Structural Antenna Add-ons SCOPE ASEC worked on our client’s PCS program where antenna additions throughout the client’s systems were modeled and towers analyzed for strength and capacity requirements for the additional loads per governing client standards, GO 95 code...