ASEC is excited to be designing a greenfield 138/34.5kV substation that will help supply carbon free power to nearby residents. The substation consists of a 138/34.5kV GSU transformer, 138kV overhead interconnection gen-tie, and 34.5kV switchgear to bring power from PV Facility to the grid. We are excited to provide full turnkey engineering solutions that minimize costs and maximize efficiencies for our clients.