SCOPE
The client is rebuilding their existing 138kV transmission lines Northaven SW – Morrison SW’. The cell equipment on the existing structures is being transferred to new structures. The scope of the project is to develop new loads for the cellular antennas installed on the structure.
PROJECT DESCRIPTION
Provided new cellular antenna loads for design of new tubular structures along with the conductor loads on the transmission line.