SCOPE

Our client’s project was a 330-mile transmission line which included fourteen (14) lattice river crossing structures. ASEC’s scope included design of the tower family and providing owner’s engineering support for the development of the loading criteria for client, inspection of proof-of-fit assembly and monitoring construction activities.

PROJECT DESCRIPTION

The fourteen (14) river crossing structures were erected across three river sections and included tangents and deadend anchor towers. The heights of the towers designed and installed ranged from 385’ to 460