by Landon Schulze | May 19, 2023 | Civil/Structural, Transmission Design
SCOPE ASEC discussed the appropriate mitigation path with the client, and then modeled the replacement structures in PLS-CADD. ASEC then created construction ready pack-ages for replacement. PROJECT DESCRIPTION ASEC has analyzed ten line segments for the client and...
by Landon Schulze | Sep 30, 2022 | Line Design, Substation Design
SCOPE ASEC is supporting our client with this 26-mile project that consists of 17 miles of overhaul-rebuild and an additional 9 miles of OPGW Fiber addition to the existing transmission line structures. The existing H-frame line is being converted to delta-monopoles....
by Landon Schulze | Sep 30, 2022 | Lattice Towers, Transmission Design
SCOPE ASEC has been tasked to design a new lattice tower family for a client’s double circuit 345kV system. PROJECT DESCRIPTION Four tower types, along with helicopter installation splicing schemes have been developed. The tower types include upto 250’ tall tangents,...
by Landon Schulze | Sep 30, 2022 | Line Design, Transmission Design
SCOPE ASEC’s client is rebuilding their existing 138kV transmission lines. The cell equipment on the existing structures is being transferred to new structures. The scope of the project is to develop new loads for the cellular antennas installed on the structure....
by Landon Schulze | Sep 30, 2022 | Fiber & Antenna Add-Ons, Transmission Design
SCOPE ASEC worked on our client’s PCS program where antenna additions throughout the client’s systems were modeled and towers analyzed for strength and capacity requirements for the additional loads per governing client standards, GO 95 code and ANSI/TIA-222...
by Landon Schulze | Sep 20, 2022 | Foundations, Transmission Design
SCOPE ASEC was required to design 138kV and 345kV drilled pier foundations for Engineered Steel Poles supported with Anchor Bolts for multiple installations for its gulf coast region client. These foundations would have to resist the soft clays and high overturning...