by Landon Schulze | Sep 30, 2022 | Lattice Towers, Transmission Design
SCOPE ASEC has been tasked to design a new lattice tower family for a client’s double circuit 345kV system. PROJECT DESCRIPTION Four tower types, along with helicopter installation splicing schemes have been developed. The tower types include upto 250’ tall tangents,...
by Landon Schulze | Sep 30, 2022 | Line Design, Transmission Design
SCOPE ASEC’s client is rebuilding their existing 138kV transmission lines. The cell equipment on the existing structures is being transferred to new structures. The scope of the project is to develop new loads for the cellular antennas installed on the structure....
by Landon Schulze | Sep 30, 2022 | Fiber & Antenna Add-Ons, Transmission Design
SCOPE ASEC worked on our client’s PCS program where antenna additions throughout the client’s systems were modeled and towers analyzed for strength and capacity requirements for the additional loads per governing client standards, GO 95 code and ANSI/TIA-222...
by Landon Schulze | Sep 30, 2022 | TheSplice
1. Abstract Geometry of a transmission line structure plays a vital role in the overall design of the transmission line. Improper geometric design due to excessive phase spacing in a transmission line structure may result in uneconomical transmission line designs...
by Landon Schulze | Sep 21, 2022 | TheSplice
Abstract As the frequency of extreme weather events increases, the cost of climate change is becoming more evident by the year. Superstorm Sandy, Hurricane Harvey, and Hurricane Ida are just three recent examples that show how costly these major events can be for...
by Landon Schulze | Sep 20, 2022 | Compliance, Distribution Design
SCOPE The scope of this program includes emergency replacements of poles for potential safety issues. Typical projects include 69kV – 138kV Transmission (636 ACSR/AW conductor), 12kV Distribution overhead (636 ACSR/AW Conductor) and 12kV Distribution Underground (2/0...
by Landon Schulze | Sep 20, 2022 | Distribution Design, Maintenance/Drone
SCOPE ASEC is currently supporting a program aimed at helping mitigate wildfires by replacing damaged equipment on overhead distribution lines. ASEC is providing engineering and design services for this program. The engineering tasks include PLS-CADD modeling, work...
by Landon Schulze | Sep 20, 2022 | Distribution Design, Fire Risk Mitigation
SCOPE Within the framework of a client’s Electric System Hardening initiative, ASEC has meticulously crafted more than 300 structures aimed at enhancing reliability. These structures predominantly featured Copper Wire components, which were subsequently upgraded...
by Landon Schulze | Sep 20, 2022 | Foundations, Transmission Design
SCOPE ASEC was required to design 138kV and 345kV drilled pier foundations for Engineered Steel Poles supported with Anchor Bolts for multiple installations for its gulf coast region client. These foundations would have to resist the soft clays and high overturning...
by Landon Schulze | Sep 20, 2022 | Civil/Structural, Substation Design
SCOPE ASEC’s client is rebuilding their existing 138kV transmission line and requested ASEC to analyze the existing substation dead-end structure to determine the maximum allowable pull-off tension capacity. PROJECT DESCRIPTION The terminal deadend structure was...